The researchers modeled the grid, its voltage controls, generators, inverters, protection systems and other equipment as a changing system rather than checking voltage only at a single steady state. For each possible trip, ramp, switching action or other disturbance, the method calculated the voltages seen by overvoltage relays during the short period before controls could respond.

In a 2,000-bus model designed to reproduce the mechanism of the 2025 Iberian blackout, the simulation showed the feedback described in the incident report: protected voltages approached trip levels, an initial trip removed reactive absorption, and later trips spread the overvoltage sequence. The method also identified missing data that prevented a firm safety conclusion.