The study addresses a planning problem in which every transmission line can be switched on or off to reduce electricity-generation costs. The researchers combined a graph-based method for setting tighter limits in the mathematical model with an iterative procedure that finds good feasible grid configurations and uses them to guide the search for the best solution.

In tests using the standard IEEE 118-bus network and 100 demand scenarios, the combined strategy performed better than conventional approaches described in the literature. The authors say the iterative procedure still converges to the global optimum, even though the procedure used to find intermediate solutions is heuristic.