Author
Marc Cheah-Mañé
Recent research
- Engineering & TechnologyOpen access
A multi-stage methodology for wind park inter-array cabling: graph preparation, routing, and sizing
Abstract. Inter-array grid optimisation plays a critical role in the technical and economic performance of wind parks and is typically divided into two primary tasks: layout length minimisation and conductor size selection. This work proposes the consideration of three primary ta...