Author
Duan Chen
Recent research
- Engineering & Technology
Abstract Because of constraints in space and budget, lock capacity expansion projects often adopt a layout in which multiple locks share a common approach channel. To prevent excessive water-level fluctuations and ensure navigation safety, a staggered operation mechanism must be...